Progress Update on the House
Let's see. The plumbing is all tied up and has been pressure tested. He wasn't sure about the Pex at first, but out of 90 fittings, only 3 leaked. Those 3 were all at the bathroom sink area, and he had them all fixed within minutes. He's decided the Pex is good. Yesterday, he built the area for the triple-wall pipe to go through the ceiling and the roof. After that was put in, he started to put up the rest of the sheet rock for the kitchen ceiling. Today, it's raining. He was glad to see that, as he wanted to check to make sure the vent pipe through the roof was not leaking. It wasn't. (I knew it wouldn't be.) The house is really coming along nicely, and it looks fantastic!
Subscribe to:
Post Comments (Atom)
Sooooooo where are the photos to prove it? LOL
ReplyDeleteNancy, there are progress photos on Facebook in my album titled "Our New House". It's my understanding that there is a storage limit regarding photos here on the Blog spot, so I hesitate to put too many up.
ReplyDeleteIn the meantime, though, all the walls and ceilings are now up in the house. ;-)
ReplyDelete